Construction Superintendent
Rockdale, TX, United States23h ago
Free account needed to apply or save. It takes a minute, and we'll bring you right back to this job.
How well do you match this job?
Key details
- Salary
- $130K–$150K/yr
- Location
- Rockdale, TX, United States
- Work style
- Onsite
- Level
- Lead / Staff+
- Job type
- Full-time
- Experience
- 10–13 yrs
- Function
- Skilled trades & Manufacturing
- Focus area
- other
- Posted
- 23h ago
Skills
About the role
Job Description
The Construction Superintendent is the senior field leader for Optimum Energy on the T1 project in Rockdale, Texas. This role reports to the Construction Project Manager and runs major construction scopes independently, leads field operations, manages risk, and serves as the primary field representative to the owner, design team, and project partners. The Superintendent owns site safety, sequencing, quality, productivity, and closeout, and works with the Construction Project Manager on cost, change control, and schedule.
The role also owns site stores management. On a greenfield industrial site, materials, owner-furnished equipment, tools, and consumables must be received, protected, tracked, and issued on time, or crews stall. The Superintendent sets up and runs that system so field work never waits on material.
This role offers a clear career path to Senior Construction Superintendent and Construction Project Manager.
About the T1 Project
T1 Energy's G2_Austin is a new solar cell manufacturing plant on more than 100 acres in Milam County near Rockdale, Texas. T1 announced the start of construction on December 17, 2025.
- Owner: T1 Energy (NYSE: TE), through T1 G2 Austin Solar Cell LLC
- Facility: Advanced TOPCon solar cell fab
- Phase One Capacity: 1 GW per year
- Phase One Investment: $400 million to $425 million
- Future Expansion: Possible second phase of about 3.2 GW, tied to demand
- Design Firm: OE and SSOE Group
- Registered Completion Date: May 31, 2027
- Jobs: Up to 1,800 manufacturing jobs expected
Cells made at G2_Austin will feed T1's 5 GW G1_Dallas module plant. For a superintendent, that means a fast-track greenfield fab with long-lead process equipment, cleanliness requirements, and heavy material flow.
Optimum Energy's scope on the project covers the Central Utility Building and the Water Management Program facilities.
Primary Responsibilities
- Project Leadership: Direct all field operations for one or more complex projects
- Manage field staff, subcontractors, suppliers, and self-perform crews
- Build and maintain construction schedules
- Plan project sequencing and workflow across trades
- Deliver work that meets schedule, quality, safety, and profit goals
- Safety Leadership: Lead and enforce a strong safety culture; heavy emphasis on OE safety program implementation for all employees and subcontractors
- Investigate incidents and put corrective actions in place
- Keep the site compliant with OE safety programs, OSHA, and owner requirements
- Coach crews and subcontractors on safe work practices
- Schedule and Cost Control: Keep field production on plan and on budget
- Manage and update project schedules
- Coordinate changes and change orders with the Construction Project Manager
- Track productivity, labor hours, and job costs
- Monitor budget performance and recommend corrective actions early
- Quality Management: Hold all work to project specifications
- Oversee QA/QC processes and documentation
- Run inspections, punch lists, mechanical completion, and closeout activities
- Coordinate reviews with the owner, architect, engineer, and authorities having jurisdiction
- Stores Management: Own site stores, including warehouses, laydown yards, tool cribs, and consumables
- Set up receiving, inspection, tagging, and issue procedures for all materials and equipment
- Keep inventory accurate through cycle counts, barcode or RFID tracking, and regular reconciliation
- Store sensitive and owner-furnished equipment to manufacturer and owner requirements, including climate control, cleanliness, and preservation
- Track long-lead items and deliveries against the schedule so crews have material before work starts
- Work with procurement and the Construction Project Manager on buyouts, expediting, shortages, and returns
- Control loss, damage, and waste, and report on stores performance and inventory value
- Supervise and train stores personnel and adjust staffing as the project scales
- Stakeholder Collaboration: Act as the primary field representative to the owner and project partners
- Lead daily standups, trade coordination meetings, and owner-architect-contractor (OAC) meetings
- Build client relationships and help secure future work
- Take part in project pursuits, buyouts, negotiations, and executive reviews
- Recruit, mentor, and develop field and stores staff
Key Competencies and Skills Expectations
- Strong command of construction means and methods, layout and surveying, and crane rigging and flagging
- Maintain the overall field schedule using Primavera P6, Microsoft Project, or similar
- Lean Construction principles, including Last Planner System and pull planning
- Productivity tracking and contract administration
- Inventory control, material receiving, and warehouse practices
- Leads multiple teams and resolves conflict on site
- Identifies risk early and puts mitigation in place
- Clear communicator and confident presenter with owners and executives
- Proficient in Procore, Microsoft Office, project accounting systems, and materials tracking platforms
Requirements
- Education: Bachelor's degree in Construction Management, Engineering, or a related field preferred
- Experience: 10+ years of construction experience, including 8+ years of field supervision; mega-project, semiconductor, or industrial experience preferred
- Technical Knowledge: Lead Construction experience on greenfield projects preferred; hands-on experience running site materials or stores operations on large projects
- Certifications: OSHA 10 and/or 30 a plus
- Travel: Full time on site in Rockdale, Texas
Optimum Energy is an Equal Opportunity Employer encouraging diversity in the workplace.
About the Company
Optimum Energy, a Bernhard Capital Partners portfolio company, has spent 20 years helping hospitals, universities, government facilities, and advanced manufacturing operations reduce energy consumption in heating and cooling systems by up to 50% and turn that infrastructure into a strategic financial and operational asset. With 300+ plants and institutions served globally, nobody understands energy infrastructure, efficiency, and financial opportunity quite like Optimum Energy.
Our Energy-as-a-Service model converts aging central utility plants into upfront unrestricted cash, cuts utility operating expenses 25 to 35%, and keeps the transaction entirely off the balance sheet. The structure has been confirmed by Big Four auditors and cited by rating agencies as a driver of improved credit outlooks.
We work with clients from master planning and design through implementation, commissioning, and into long-term operations and maintenance. How we show up depends on what the client needs. That could mean fully managed plants with Optimum carrying total accountability for performance and uptime. It could mean supplementing an existing facilities team with engineering support, analytics, training, and escalation resources. Or it could mean a tailored combination of both. In every engagement, we stay for the life of the agreement.
Proprietary technology, including OptiCx and OptimumLOOP, powers everything we do. It is not what we sell. It is what enables us to deliver the most continuous, precise system-level optimization across chilled water, hot water, and steam plants available in the market today. Machine learning algorithms trained on two decades of operational data adapt to load, weather, and occupancy in real time. AI-driven predictive maintenance and fault detection catch equipment degradation before it becomes a problem. We guarantee the performance. We carry the risk.
Behind the technology is a team built on a simple set of principles: be sharp, be relentless, and be accountable for outcomes. Our people are engineers, operators, and financial structurers who would rather solve the hard problem than talk around it. Every engagement gets that same intensity, whether the scope is a single plant or a 26-site enterprise portfolio. For more information, visit www.optimumenergyco.com.
About the Industry
Commercial and institutional HVAC infrastructure is aging faster than organizations can replace it. Hospitals are running central plants built in the 1960s and 70s. Universities carry over $112 billion in collective deferred maintenance nationally. Advanced manufacturing operations face intensifying energy demand from reshoring and facility expansion. Rising energy costs, tightening regulations, sustainability mandates, and a skilled trades labor gap that shows no sign of closing all compound the pressure.
Connected systems are generating more data than most organizations can act on. The capacity to analyze it and translate it into operational decisions requires platforms and people most facilities teams do not have. The industry is not short on ambition or technology. It is short on the capital structures, operational models, and workforce capacity to turn intent into sustained results.
Why Optimum Energy?
With 300+ sites and over 300M square feet of operational data, our machine learning algorithms
continuously optimize in real time. No competitor replicates this at scale.
We do not sell software, and we do not sell equipment. We deliver guaranteed outcomes through the convergence of deep engineering expertise, proprietary optimization technology, and financial
structures that align our interests directly with those of our clients. That means tailoring solutions to unique financial and operational realities, not forcing a one-size-fits-all model. It means verifiable success across facility design, ongoing operations, and complex deal structuring. And it means protecting client investments by optimizing the 70% of total costs that occur after day one.
Our EaaS contracts transfer construction, performance, and lifecycle risk entirely. No upfront capital. No balance sheet impact. Capital that would have gone to back-of-house infrastructure stays available for the priorities that matter most, whether that is clinical growth, enrollment expansion, or production capacity.
No other firm brings this combination of engineering, technology, operations, and financial structuring under a single partnership.